Main bathroom soffit demo

I rip out the 1980s style soffit as part of an entire main bathroom remodel. pdf version
2022-05-07_Main-bath-soffit-demo_01.jpg
Ripping the dual-sink vanity and the giant mirror out of the bathroom makes it look a lot less 1980s. Same for the wood louvered medicine cabinet. But there is still that soffit with buzzing fluorescent lights inside it. It not only screams "old-fashioned," it makes the room look smaller. I have already received the new vanity, and just ordered the medicine cabinets, and vanity lamps. Time to demo. The next-door neighbor ripped a soffit out of his bathroom, and he warned me that the plywood top is not over the ceiling drywall. When the plywood comes down, so does all the insulation in the attic. So I will rip out the soffit structure, but I have to leave the plywood ceiling board, and there is a stud in the front that is also open to the attic. I will put the small stuff in the garbage. Dump run later.
Bottom of first columnmove down to the left

2022-05-07_Main-bath-soffit-demo_02
After popping out the plastic frosted panels, the frame for the light comes out in one piece.
2022-05-07_Main-bath-soffit-demo_03
The key thing, and perhaps hardest, was getting all the corner bead pulled down. There was alot.
2022-05-07_Main-bath-soffit-demo_04
I put the detritus in trash bags for the garbage person. It's a messy job.
move up a little to the right move down to the left
2022-05-07_Main-bath-soffit-demo_05
The face drywall came out pretty easy. Be sure to cut the paper tape up to the ceiling.
2022-05-07_Main-bath-soffit-demo_06
There was a lot of metal corner molding on the inside rim.
2022-05-07_Main-bath-soffit-demo_07
Cut that corner paper tape or some of the ceiling drywall might come down as well.
move up a little to the right move down to the left
2022-05-07_Main-bath-soffit-demo_08
The metal corner bead starts to collect on the floor before getting folded up for the trash.
2022-05-07_Main-bath-soffit-demo_09
Checking the construction, these inner end caps have to come out next.
2022-05-07_Main-bath-soffit-demo_10
That lets the front inner drywall to pop out in one piece, it is laying on the drain lines now.
move up a little to the right move down to the left
2022-05-07_Main-bath-soffit-demo_11
Working on the frame was easier from the middle out to the left corner.
2022-05-07_Main-bath-soffit-demo_12
The cripple studs come out easily once the lower frame piece is levered out.
2022-05-07_Main-bath-soffit-demo_13
The back rail was tough. It was toe-nailed into the wall studs. Lots of twisting and pulling.
move up a little to the right move down to the left
2022-05-07_Main-bath-soffit-demo_14
The upper rear frame rail was nailed to the plywood, a hammer helped coax it out.
2022-05-07_Main-bath-soffit-demo_15
I had to leave the front top frame rail in since it opened to the attic. Same for the plywood.
2022-05-07_Main-bath-soffit-demo_16
Lots of little cripple studs, but nice dry wood that did not weigh a lot in the garbage can.
move up a little to the right move down to the left
2022-05-07_Main-bath-soffit-demo_17
The metal corner bead got bent up into a trash bag, the wood rails are for a dump run.
2022-05-07_Main-bath-soffit-demo_18
The job is not done until the room is cleaned up and the demo stuff tossed out.
2022-05-07_Main-bath-soffit-demo_19
Two great things, I now know where the ceiling joists are, and I will rip out all the drywall.