The original lumber had a 45-cut on the top piece to eliminate the little hole. This cut is where a lot of rot started. I elected to have the hole and keep the top board one piece. .
And the job is not done until the tools get cleaned up and put away. Every time I think I have all the tools needed, there is something that comes up that requires another trip to the toolbox. At least I have some limited tools in the garage, so the walk was shorter. This main work area is in the living room. No way I am working the hot Florida garage if I can be in the air conditioned house.
The next job is the long north wing wall, just over 12-feet, so I have to buy 16-foot lumber, cut it down in the store, and haul it home.
|